| Ian
Harridge , Nantwich, Cheshire |
|
| |
|
Number of Defects
|
110
|
Main Problems
|
Mr Harridge has numerous
problems with his home both internally and externally
|
When we inspected the property we found it to
be finished to a poor standard, with particular concern regarding
the plastering and joinery.
We told Mr Harridge we would pursue the matter
with the developer and ensure that remedial works would be addressed
as soon as possible.
Many defects have been rectified in the property,
however the process was taking too long and our client had not been
provided with a full schedule of works covering all of the detail
on our report.
As a result of this unsatisfactory situation,
we contacted the developer and Stephen Nancarrow attended a meeting
at the property to discuss the situation with the Managing Director.
The developer has now agreed that this property
will be rectified as soon as possible. Meanwhile we are advising
our client on a suitable compensation claim.